Every movement has a fixed portion: the booking, the collection, the handling at each end, the documentation, the space on a vehicle that cannot be shared. Those costs do not shrink in proportion to the crate, so a small order carries the same fixed burden across fewer parts.
The effect is easiest to see at the extremes. A single section shipped across the world can cost more to move than to make, while the same section inside a full pallet is almost free to move. Nothing about the part changed.
Collection is one. A vehicle sent to a loading bay costs the same whether it takes one crate or fills up. Documentation is another: the invoice, the packing list, the declaration and the clearance effort are much the same for a small consignment as for a large one.
Handling is the third. Each time a crate is lifted, checked and set down, someone is paid for it, and the number of handlings depends on the route rather than on the size of the load. A small crate is handled as often as a large one.
A small order still needs a crate that protects it, and skimping on packing to save on materials is the false economy in this corner of the trade. Damage on a small consignment is proportionally more painful because there is no other stock to fall back on.
The saving lies in the dimensions rather than the structure. A crate built tight to the part, with no empty volume to pay for, moves for less in every mode. Consolidating several small items into one crate does the same work as ordering fewer, larger items.
Where an order can wait, grouping lines into a single consignment spreads the fixed cost across everything in it. Buyers who order a system at a time rather than a component at a time usually find the freight burden sits more comfortably.
Grouping also reduces the number of clearances. Each separate consignment is a separate entry, a separate set of charges and a separate chance of a query, so fewer movements means less administration as well as less freight.
Air freight on a small part is sometimes the rational choice rather than an indulgence. A single replacement section that completes a build is worth more in place than in transit, and the premium buys schedule rather than comfort.
The judgement is whether the part is holding up work. If it is, the faster mode is a production decision. If it is going into stock, the slower mode is almost always correct and the only question is how to fill the consignment.
The most effective way to control freight per unit is to order in quantities that fill a sensible unit of movement. That is a stocking decision made long before the crate is built, which is why dealers tend to hold a small buffer of common sections rather than ordering to the job.
Sections cut to length are easy to hold and easy to combine, which is why exhaust pipework suits that approach, and the same logic applies across the fabricated parts range, where a few standard items cover most jobs.